Tuesday, July 25, 2006

Musical Deerstands

Hokey-Pokey, MS> OK, this is the way it works. (make sure temperature outside is over 100 degrees) Take Point Stand and move it to Number 1 field, repair and take Number 1 stand to new Sneaky Stand. Take new tripod to Narrow Field, take that stand to Levee. Take a new 2 man stand to Spike Camp, remove that stand and put on Clover Field. Take new tripod to Point Stand. Take new 2 man to South Corn Field, remove that stand and put at Graveyard. Drag Pond stand all over bottom and then put it back where it was. Got it?

No comments: